Road Maintenance Simulator
https://store.steampowered.com/app/1419040
Rank: 21632 von 92357 Spielen
AppID: 1419040
Typ: game
Entwickler: Caipirinha Games
Publisher: Aerosoft GmbH
Plattformen:
Windows
Release Date: 2022-04-06
Spielzeit aller Spieler in der Datenbank: 7 Stunden
Erreichte Errungenschaften: 21
Durchschnittliche Errungenschaften pro Spieler: 3 / 50
Aktueller Preis: 24.95€
Niedrigster Preis: 13.72€
7 Spieler*
1 Spieler online
2345 Followers
Mixed
54% Positive Reviews
91 Positive Reviews
77 Negative Reviews
Experience the everyday life in a German street maintenance service and complete a variety of realistic tasks in the area of road construction and maintenance! For your work you will have unique vehicles and various usable tools at your disposal.
# | Unlocked | Locked | Name | Beschreibung | Spieler | Global |
1
|
|
|
Battering Ram
|
NPC vehicle rammed.
|
3
|
75.7%
|
2
|
|
|
Wheelbarrow
|
Fully load up wheelbarrow.
|
2
|
65.2%
|
3
|
|
|
Saw
|
Mission "Trim Trees – Federal Road" complete.
|
0
|
25.8%
|
4
|
|
|
Scissors
|
Mission "Trim Trees – County Road" complete.
|
2
|
25.1%
|
5
|
|
|
Brush
|
Mission "Mark Lanes – County Road" complete.
|
1
|
23.7%
|
6
|
|
|
Hole
|
Mission "Fix Asphalt – County Road" complete.
|
1
|
23.3%
|
7
|
|
|
Spray can
|
Mission "Mark Lanes – Federal Road" complete.
|
0
|
22.9%
|
8
|
|
|
Bucket
|
Mission "Fix Asphalt – Federal Road" complete.
|
1
|
22.7%
|
9
|
|
|
Hand broom
|
Mission "Clean-up Road Shoulder – County Road" complete.
|
1
|
20.1%
|
10
|
|
|
Trash Picker
|
Mission "Clean-up Road Shoulder – Federal Road" complete.
|
0
|
20.1%
|
11
|
|
|
Broom
|
Mission "Clean-up Road Shoulder – Highway" complete.
|
0
|
19.7%
|
12
|
|
|
Drop of water
|
Mission "Clean Guardrail – County Road" complete.
|
0
|
19%
|
13
|
|
|
Traffic Beacon
|
Mission "Cordon-off Work Area – County Road" complete.
|
0
|
18.8%
|
14
|
|
|
Tar
|
Mission "Tar Road – County Road" complete.
|
1
|
18.6%
|
15
|
|
|
Traffic Beacon with light
|
Mission "Cordon-off Work Area – Federal Road" complete.
|
0
|
18.6%
|
16
|
|
|
Delineator left
|
Mission "Put Up Delineators – Federal Road" complete.
|
1
|
18.5%
|
17
|
|
|
Barrier
|
Mission "Cordon-off Work Area – Highway" complete.
|
2
|
18.3%
|
18
|
|
|
Delineator right
|
Mission "Put Up Delineators – County Road" complete.
|
0
|
18.3%
|
19
|
|
|
10
|
10 missions completed.
|
1
|
18.3%
|
20
|
|
|
Foam
|
Mission "Clean Guardrail – Federal Road" complete.
|
0
|
18.1%
|
21
|
|
|
Turn right
|
Mission "Align Delineators – County Road" complete.
|
0
|
17.7%
|
22
|
|
|
Turn left
|
Mission "Align Delineators – Federal Road" complete.
|
1
|
17.5%
|
23
|
|
|
Jet of water
|
Mission "Clean Guardrail – Highway" complete.
|
1
|
17.5%
|
24
|
|
|
County Road
|
Mission "Remove Cordon – County Road" complete.
|
1
|
17.1%
|
25
|
|
|
Federal Road
|
Mission "Remove Cordon – Federal Road" complete.
|
0
|
16.5%
|
26
|
|
|
Highway
|
Mission "Remove Cordon – Highway" complete.
|
0
|
15.8%
|
27
|
|
|
Guardrail
|
Mission "Replace Guardrail – Highway" complete.
|
0
|
14.9%
|
28
|
|
|
Screwdriver
|
Mission "Replace Guardrail – Federal Road" complete.
|
0
|
14.6%
|
29
|
|
|
Screw
|
Mission "Replace Guardrail – County Road" complete.
|
1
|
14%
|
30
|
|
|
Right of way
|
Mission "Put Up Signs – Road Network" complete.
|
0
|
13.6%
|
31
|
|
|
Straight ahead
|
Mission "Align Delineators – Highway" complete.
|
0
|
13.4%
|
32
|
|
|
Stop
|
Mission "Align Signs – Road Network" complete.
|
1
|
12.8%
|
33
|
|
|
25
|
25 missions completed.
|
0
|
3.3%
|
34
|
|
|
Thumbs up
|
All different missions completed once.
|
0
|
1.9%
|
35
|
|
|
Trash bag
|
100 full trash bags disposed.
|
0
|
1.2%
|
36
|
|
|
Boot prints
|
100 traffic beacon bases dismantled.
|
0
|
1%
|
37
|
|
|
Boot print
|
100 traffic beacon bases put up.
|
0
|
0.9%
|
38
|
|
|
Dumpster
|
20 broken guardrails disposed.
|
0
|
0.8%
|
39
|
|
|
Washing machine
|
50 guardrails cleaned.
|
0
|
0.8%
|
40
|
|
|
50
|
50 missions completed.
|
0
|
0.7%
|
41
|
|
|
100
|
100 missions completed.
|
0
|
0.3%
|
42
|
|
|
Hand
|
100 delineators aligned.
|
0
|
0.3%
|
43
|
|
|
Sun
|
50 trees trimmed.
|
0
|
0.2%
|
44
|
|
|
Straight line
|
100 lines marked.
|
0
|
0.2%
|
45
|
|
|
Jackhammer
|
Fixed asphalt 15 times.
|
0
|
0.2%
|
46
|
|
|
Reflector
|
50 delineators put up.
|
0
|
0.2%
|
47
|
|
|
Vehicle
|
All vehicles used.
|
0
|
0.1%
|
48
|
|
|
Bin
|
15 roads tarred.
|
0
|
0.1%
|
49
|
|
|
Attention
|
100 signs aligned.
|
0
|
0.1%
|
50
|
|
|
Intersection
|
100 signs put up.
|
0
|
0.1%
|